IRZ TMS-ORD4 integrated system has been designed in collaboration with OOO “NPF Paker” and is intended for dual completion wells equipped with one ESP. It allows leak-proof separation or restriction of one of the reservoirs without shutdown of the motor.
Parameter | Value |
---|---|
Intake pressure, kgf/cm2 | 0…320 (0…600) |
Pump intake temperature, °C | 0…150 |
Motor oil temperature, °C | 0…5 |
Radial vibration, g | 2 |
Parameter | Value |
---|---|
Intake pressure, kgf/cm2 | 0…320 (0…600) |
Temperature of reservoir to be separated, °C | 0…150 |
Valve position, % | 0…100 |